EA Brown Blue Mountain Cider Company and Winery

Below: Ea Brown Winery Basement floor project during prep of
concrete surface, includes shot blasting and grinding edges
along with keying out doorways, joints and large cracks

Below, the shot blast machine is running very slowly to give us the rock profile for excellent bonding

Below: Primer being applied

Below: Some low areas had to be filled in

Below, the first coat of 4 coats is being applied and filled with sand for thickness and wear
after 4 coats the floor will be 1/4 inch thick

Below, a cove is applied at the wall after the first or second coat  to provide a good seal and easy cleanup

Below, after the last coat is applied the floor is ready to use within hours