Misc Dairy Job Start to finish
 

  
Above views show the concrete before prep

  
Above view shows after prep of cement                                  Above shows floors after coatings have been applied
 

  
Above: A dairy barn milk house/tank room, after concrete prep and removal of existing failed coatings

  
Above: Shows the before and after pictures around the drain, how the floor is restored to prime condition

  
Above: More before and after shots including a coat being liquid applied and squeegied for a 1/4 inch total thickness


Final shot of the floor ready for use with non skid finish
Return to Cascade Floors Home Page